##### SUMMARY RESULTS FOR SCENARIO *test_w_energy_products* #####

### CAPACITY RESULTS ###

--> New Energy Procurement <--
                             New Energy (MW)
load_zone technology period                 
Zone1     Hydro      2020          26,280.00
          LF         2020          92,856.00

### OPERATIONAL RESULTS ###

--> Energy Production <--
                             Annual Energy (MWh)  % Total Power
load_zone period technology                                    
Zone1     2020   Hydro                 26,280.00          20.00
                 LF                    92,856.00          70.67
                 Wind                  12,264.00           9.33
